34
5 . Initial Operation
NOTE!
During shipment, condensation moisture
can accumulate in the stove’s interior,
which may possibly lead to the appearance
of condensation or water on the stove or
uepipes. Please dry off these damp areas
immediately.
The surface of your stove was treated in a sand-
blasting machine before applying the colour coating.
Despitecarefulandthoroughinspection,theremay
still be some residual material in the stove body,
which can fall out when your stove is being installed.
NOTE!
To prevent any damage, please immediate-
ly vacuum up these small steel pellets with
a vacuum cleaner.
Thersttimeastoveisoperated,theheatdevelop-
ment causes the emission of volatile components
fromthecoating,sealingstripsandlubricants,and
smoke and odours can occur.
Atahighercombustiontemperature,thisone-time
process can take between 4 to 5 hours.
To achieve this higher combustion temperature,
pleaseincreasethefuelquantityrecommended
in Section 7, „Adding Fuel/ Heating with Nominal
ThermalOutput“,byapproximately25%.
CAUTION!
To prevent adverse effects on health, no-
body should stay in the room(s) during
this process unless absolutely necessary.
Make sure the room is well-ventilated and
open the windows and outside doors. If
needed, use a fan for faster air circulation.
If the maximum temperature is not reached during
therstheatingoperation,youmaynoticeanodour
for a short period of time the next time the stove is
used as well.
6. Lighting the Fire
Theringupphaseshouldbeasshortaspossible,
since higher emissions can occur during this phase.
TheslidersettingsdescribedinTable1(seegure
on the right) are recommendations that were de-
terminedunderconformancetestingconditions,in
compliance with the relevant standard. Depending
on the weather conditions and the draught capability
ofyourchimney,accordinglyadjustthesliderposi-
tions for your Jena to the local conditions.
NOTE!
The Jena may only be operated when the
re box door is closed; the re box door
may only be opened to add fuel.
WARNING!
Never use spirits, petrol, or other amma-
ble uids to light the stove.
Lighting the Fire
Procedure Position of Control
Elements
Completely open prima-
ry and secondary air.
Openregrate.
Pull primary and secondary
air slider all the way out.
Pulloutregrateslider.
Pile up any remaining
ash and unburned
Charcoal into the centre
of the combustion
chamber.
Place 2-3 small logs
into the middle of the
rebox;stackapprox.
0.5 kg of dry wood
chips on top.
Lighttheignitionmateri-
al at several places.
Tab. 1
Commentaires sur ces manuels